Smart, stylish and simple to use, the Toyota HomeCharge is designed to work seamlessly with your Toyota plug-in hybrid or fully electric vehicle.
Toyota HomeCharge
Charger & installation £1,095
Additional costs only apply if extra work is required to complete your installation.
Price breakdown | |
|---|---|
| Standard installation, based on up to 10m of cable, external route and no bonding work. | Included |
| Commissioning & safety checks | Included |
| Survey & installation management | Included |
| Warranty & technical support | Included |
| Bonding, only needed in some homes to meet electrical safety regulations. | £160 |
| Longer cable runs or wall routing. Depending on distance and whether internal wall access is needed. | £90-£300 |
Expert recommended
Save more with a British Gas EV tariff
Charge for less and get cheaper overnight electricity for your whole home with their dedicated EV tariff.
Submit your details
Answer a few simple questions to confirm where you’d like your new charger installed.
Upload photos
Upload photos of your home and British Gas will start planning your EV charger installation.
Get your quote
British Gas will review your details and send you a personalised quote to fit your new charger.
Get it installed
Their approved experts will fit your electric car charger on a day that suits you, usually within 4-5 hours.
1
2
3
4
Expert recommended
Save more with a British Gas EV tariff
Charge for less and get cheaper overnight electricity for your whole home with their dedicated EV tariff.

Works with Toyota EVs and plug-in hybrids
Toyota HomeCharge features a Type 2 connector and works with a wide range of Toyota EVs, including plug-in hybrids and fully electric models.

Durable and elegant design
Whatever your style, the HomeCharge is made to complement any home and last for years to come.

Connected charging
Simply download the MyToyota app to seamlessly integrate your car with HomeCharge – schedule charging sessions, monitor your state of charge and check your battery status remotely with ease.
Frequently asked questions
What is a standard installation?
Our standard installation includes a remote home check (if required) plus EV charger installation by a certified approved engineer:
Your Hive EV charger attached to an accessible external wall
10m of charger supply cabling (Tuffex) connected (with a maximum of 5m internal)
1 external wall breakthrough
Matt:e O:Pen and load management / curtailment device fitted (where appropriate)
3-year warranty on the charger and installation
How will I know if I am having a ‘standard’ install?
I'm an installer. What should I know before completing the installation?
- Be a suitable qualified electrician with relevant training, qualifications and / or certifications to complete the work
Complete the installation in accordance with:
Any applicable laws and / or regulations including, but not limited to, IET Wiring Regulations (BS 7671) and the IET Code of Practice for Electric Vehicle Charging Equipment Installations
Distribution Network Operator (DNO) requirements. DNO approval or acknowledgement must be obtained before or after the installation.
Provide the following to the user or property developer after the installation:
BS7671 Electrical Installation Certificate
DNO approval or acknowledgement
What is a Matt:e R or Matt:e T device?
What is a Load Management Device?
What is a DNO and how can I tell who my DNO is?
Why does the DNO need to know about my charger installation?
If not, for example you've been referred to Hive by one of our industry partners, or are having a British Gas arranged install, the following information is for you:
All electric vehicle charge point installers need consent from the Distribution Network Operator. As such, British Gas must report planned electrical work to gain permission to add more electrical load to the area.
What happens on the day of my install?
If you don’t already have the Hive app, we would advise you download it prior to the installation day to your smart phone or device as the engineer will talk you through how we pair your new charger to the app.
Make sure someone over 18 is available to meet our engineer, answer any questions and stay with them throughout the appointment.
The engineer may need to switch off your electricity supply to install your charger. So, it's a good idea to switch off any appliances or electronic equipment that may be affected, including any household alarms, before we start your installation.
Make sure there's clear access to the area where you want the charger installed. For example, we'll need to access any locked gates or cupboards.
Please make sure young children and pets are kept safely out of the way.
What if I need to change the date of my installation?
Is there a warranty on the charger?
Who are ChargedEV and what happens if I want to buy a charger with installation?
Do I get a warranty if I buy my charger and installation through ChargedEV?
Installing your EV charger
What is a standard installation?
Our standard installation includes a remote home check (if required) plus EV charger installation by a certified approved engineer:
Your Hive EV charger attached to an accessible external wall
10m of charger supply cabling (Tuffex) connected (with a maximum of 5m internal)
1 external wall breakthrough
Matt:e O:Pen and load management / curtailment device fitted (where appropriate)
3-year warranty on the charger and installation
I'm an installer. What should I know before completing the installation?
You’ll need an EO-certified EV expert to install your charger and validate your warranty. Find your nearest one here
Complete the installation in accordance with:
Any applicable laws and / or regulations including, but not limited to, IET Wiring Regulations (BS 7671) and the IET Code of Practice for Electric Vehicle Charging Equipment Installations
Distribution Network Operator (DNO) requirements. DNO approval or acknowledgement must be obtained before or after the installation.
Provide the following to the user or property developer after the installation:
BS7671 Electrical Installation Certificate
DNO approval or acknowledgement